G. Project Quality Records

Project Charter

Project Plan with all Supporting Documents

Blue Print

Functional Specification

Technical Specification

Walkthrough / Review reports

Unit /Baseline Test Spec

Integration Test Spec

Unit /Baseline Test results

Integration Test Results

Acceptance

Customer Correspondence

Change Control Records

Training Records

PES Decision Sheets

Project Reports

Document Distribution Lists

Code Review Reports

Project Metrics

Marked Checklists

Customer ABAP Object List

SPDD / SPAU Program List

Upgrade Document

Synchronization List of Program

Installation Log

Note: Project Quality Records will be retained in the Livelink for minimum 2 years / as decided by SEPG.

H. Controlled Documents in a Project

1. Project Charter

2. All plans - project, quality, configuration management, test, training, risk management

3. All specifications - BP, Functional Specs, Technical Specs, Customization Document

4. All test specifications (unit / baseline, integration)

5. All review records , audit reports

6. Maintenance Requests, Change Requests, Change Control Logs etc.

7. All upgrade related Documents like Customer ABAP Object List, Upgrade Document, SPDD / SPAU Object List List, Synchronization Program List, Transport Document etc.

8. Project Report

Note: Version Control will be maintained for charter, plan & specifications. Other documents will be controlled with the proper naming convention identified in the document numbering scheme.

I. Formats

Page 1, the first page of all templates contains the following information in the format shown below:

Project Name:

Document Name:

Document ID:

Version No:

Prepared by:

Contact No.

Date:

Reviewed by:

Contact No.

Date:

Approved by:

Contact No.

Date:

Released by:

Contact No.

Date:

Revision History

Sr. No.

Version No.

Date of Revision

Section Number

Description of Change

Reason for Change

Change made by

Reviewed by

The following header is printed on all project documents subject to control:

------------------------------------------------------------------------------------------------------------

MARKWAY TECHNOLOGIES PVT. LTD.

------------------------------------------------------------------------------------------------------------

The following footer is printed on all project documents subject to control:

------------------------------------------------------------------------------------------------------------

Document ID

Page I of n

Controlled Document

Document Name

ãCopyright - Do Not Duplicate

------------------------------------------------------------------------------------------------------------

In the footer, I stands for current page number and n for the total number of pages.

Documents other than templates like any type of Reports, Checklists, Excel Sheets etc. need not

have a separate first page. However, header & footer should remain same for every document except

for Excel sheets.

Guidelines/examples in template shall be in italics. Body text shall be Arial 10.

This format shall be followed for all internal documents where as for the documents shared with

customer, the format may be changed as per their requirement.

However, in such case a separate standard has to be defined.

Whenever a project document is prepared, the heading / name of the document shall be suitably

modified to suit the project.

J. Document Numbering Scheme

This section explains the numbering scheme for all SISL documents within the scope of the Quality Management System.

1. Numbering scheme for project documents

The document number will have the following format:

__

Where

Ø Project ID is assigned by PM and will be having a maximum of “5” character length.

Ø Document ID is the Short name of the Document and will be having a maximum of “4” character length except for engineering documents.

For engineering documents,

Document ID shall be

_

Where,

Module ID shall be limited to “3" character length & Number shall be of “3” character length preferably running serial number.

If specific module is not applicable, Module ID can be given as “ZZ”

Ø Free text shall be either Version Number, Date or Month as suitable.

2. Illustration of Document Numbering Scheme

Ø First version of Project plan of EMCURE Project shall be

EMCUR_PP_1.0

Ø Project Quality Report for the month of January 2004 for EMCURE project shall be

EMCUR_PQR_Jan04

Ø Minutes of Meeting dated 01-01-04 for EMCURE project shall be

EMCUR_MOM_01Jan04

Ø Functional Specification for SD module for EMCURE project shall be

EMCUR_FS01_SD001_C014

Ø Blue Print for EMCURE project shall be

EMCUR_BP_ZZ001_1.0

3. General Note for Naming and Numbering Convention

1. No Space should be provided before and after underscore.

2. For Configurable items, versions would start at 1.0 and for changes, the version control will be in steps of 1.0, starting from 1.0, and 2.0, 3.0 and so on for all major changes like changes in scope, schedule deliverables etc. For minor changes, versions shall be maintained 1.1, 1.2 etc. Decision on major & minor shall be to the discretion of Project Manager. This shall be clearly defined in the Project Plan

3. All draft documents shall contain DX along with version number, where “X” is the draft number. e.g. COA-PP-D1 for the first draft & COA-PP-1.0D1 for the draft, during revision after base lining the first version.

4. Live link labelling shall be as per the id of the document.

4. ID FOR STANDARD MODULES ARE

Module Name

ID

Financial Accounting

FI

Controlling

CO

Materials Management

MM

Production Planning & Controlling

PP

Production Planning & Controlling – Process Industry

PI

Quality Management

QM

Sales & Distribution

SD

Plant Maintenance

PM

Customer Services

CS

Project Systems

PS

Treasury

TR

Advance Planning & Optimizing

APO

Business Information Warehousing

BIW

Customer Relationship Management

CRM

Strategic Enterprise Management

SEM

5. SAMPLE SHORT NAME FOR STANDARD DOCUMENTS IN A PROJECT ARE

Document Name

Short Name

Project Plan

PP

Project Charter

PC

Blue Print

BP

Functional Specification

FS01------FS99

Technical Specification

TS01------TS99

Unit Test Specification & Results

UTS

Integration Test Specification & Results

ITS

Responsibility Transfer Form

RTF

Project Report

PR

PES Decision Sheet

PDS

Minutes of Meeting

MOM

Delphi Estimation Work Sheet

DEW

Customer Feedback Form

CFF

Project Organization Structure

POS

Attendance Record

AR

Course Feedback

CF

Lessons Learnt

LL

Risk Escalation Level Calculator

REL

Program Documentation

PD

Test Details & Error Log

TE

Customization Document

CD

Note: Above are the suggested short names if not separately defined in Project Plan. If the project contains deliverables not listed above, the shortname shall be defined in the projectplan

K. Quality Assurance Table

Review Object

Responsibility

Reviewers

Type of Review

Approval

Estimation Document

TL / PM

PM/SM

Offline Review

PM/SM

Project Charter

PM

SM, PQM

Offline Review

SM / Customer

Project Plan

PM

PQM, TC, SM

Walkthrough

SM,TC

Project Report

PM & PQM

PQM, TC & SM

4 eyes Review / Offline Review

TC, SM

Business Blue Print

PT (Functional)

Self review - 100%, Sampling by Peer / PQM

4 eyes review / Offline Review

PM / Customer

Functional Specification

PT (Functional)

Self review - 100%, Sampling by TL / PQM

4 eyes review / Offline Review

TL

Technical Specification

PT (ABAP)

Self review - 100%, Sampling by TL / PQM

4 eyes review / Offline Review

TL

Code

PT (ABAP)

Code Inspector / Peer PT / TL, Sampling by PQM

4 eyes review / Offline Review

TL

Unit Test Specifications

PT (ABAP)

Self review - 100%, Sampling by TL / PQM

4 eyes review / Offline Review

TL

Unit Test Result

PT (ABAP)

TL / PQM

Offline Review

TL

User Documentation ( Offshore ABAP)

PT (ABAP)

Self review - 100%, Sampling by TL / PQM

4 eyes review / Offline Review

TL

Integration Test Specifications

Customer /TL

Customer

Offline Review

Customer

Integration Test Result

Customer /TL

PM & Customer

Offline Review

Customer

Customization Document

PT (Functional)

Self review - 100%, Sampling by Peer / PQM

4 eyes review / Offline Review

PM / Customer

Customer ABAP Object list

PT (ABAP)

Self review - 100%, Sampling by TL / PQM / PM

4 eyes review / Offline Review

Customer

SPDD / SPAU Object List

PT (Basis)

Self review - 100%, Sampling by TL / PQM / PM

4 eyes review / Offline Review

Customer

Upgrade Document (Development, Quality & Production)

PT (Basis)

PQM, TL / PM

Offline Review

Customer

SPDD /SPAU Adjustments

PT (Basis)

Self review - 100%, Sampling by TL / PQM / PM

4 eyes review / Offline Review

Customer

Synchronization List of Programs

PT (Basis)

Self review - 100%, Sampling by TL / PQM / PM

4 eyes review / Offline Review

Customer

Lessons Learnt

PM

PQM

Offline Review

SM

PES Presentations

PM

PQM

Offline Review

SM

TC - Technical Controller

TL – Team Lead

SM - Systems Manager

PQM – Project Quality Manager

PT - Project Team Member

The review participants shown here are recommended. Additional participants may be involved as required. Any person trained in leading a review is suitable for the role of Moderator.

For minor changes, Offline Review can be done. For major changes, review should be done as suggested

PQM review with respect to work products will be limited to the adherence of QMS and quality of the deliverable. If PQM is technically qualified to perform the technical review, another reviewer is not required. Alternately peer reviewer also can ensure adherence to QMS.

L.Difference Between Review Methods

Questions

Off-line Review

4-Eyes Review

Walkthrough

Inspection

Review meeting required ?

no

yes

yes

yes

Review object distributed to participants prior to meeting ?

not applicable ( no review meeting)

preferred, but not mandatory

yes

yes

Author takes discretion about accepting reviewer's comment

yes

no

no

no

Separate Moderator's role defined ?

no

no

yes

yes

Separate Reader's role defined ?

no

no

no

yes

Selection of reviewers done by Author with Project Manager

not required

permitted ( Author alone can decide )

yes

no

Distribution of review material to the review participants is done by

Author

Author

Moderator

Moderator

Is the reader same as author ?

not applicable ( no review meeting)

Reader's role not defined

Reader's role not defined

no

Preparation Phase required

Not applicable

no

yes

yes

Preparation time rate defined/followed ?

Not applicable

no

yes

yes

Review meeting may be cancelled, because reviewers are not completely prepared

Not applicable

may be

yes

yes

Formal aspect/stylistic issue/spelling/grammatical errors discussed ?

yes

yes

noted separately but not recorded

no

Solutions to problems discussed ?

permitted

permitted

no

no

Checklist?

recommended

recommended

mandatory

mandatory

Separate Recorder Needed?

no

no

recommended

mandatory

M. Checklist for Moderator

Review Planning ( before calling for invitation)

1

Is the review object complete?

2

Is the review object up-to-date?

3

Is the checklist for the review object up-to-date?

4

Are all necessary standards/guidelines available?

5

Are all referenced documents available?

6

Has a room reservation been made?

7

Has enough time been planned for the review object?

8

Do all reviewers know how the review process is carried out?

9

For comments technique: Were all reviewers informed about the deadline for submission?

10

Is there any obvious errors in the review object , (before calling review meeting )?

11

Is the size of the review object NOT too large ? ( Less errors are detected for too much large object )

12

Is the time estimation for preparation is more or less OK and proportional to the size of the review object ?

13

Is the label of the review object locked in configuration management archive ?

14

Whether all the necessary tools that need to be run has been actually run ? ( e.g. static code checker for code review, Requirement Tracing tool etc. )

After calling for review meeting and before review meeting :

1

Whether there are enough attendance confirmations for the review?

2

Have all reviewers received and read the documents?

3

Are the reviewers facing major problem in understanding the review object

4

Are there large no. of major errors detected by most of the reviewers ? ( In this case, the moderator may cancel the review session )

5

For comments technique: Have all comments been submitted and are they clear?

During Review Meeting :

Is the version of the review object presented in the meeting is the same ?

Are the solutions NOT discussed in the review meeting ? ( In case of Walkthorugh and Inspection )

Is everybody getting a scope to speak out ( including the weakest speaker) ?

Is there sufficient time left for the recorder to note down the defect after detection of every error ( no discussion during recording)?

Has everybody signed on the review protocol before leaving the meeting room ?

After the Review Meeting :

Are all the defects corrected & verified?

Whether all the open issues ( if any ) detected during the review meeting are closed within planned dates or escalated at higher level?

Is the corrected version put under configuration management ( with fixed label ) and released?

Whether the author has intimated about the release to the affected group/customer ?

N. Project Plan Review Checklist

Sr. No.

Point to be Verified

1

Are the contents comprehensive in that they cover all activities throughout the project?

2

Are the referenced documents mentioned?

3

Has the contract/SLA/SOW been referred while preparing the plan?

4

Are the deliverables of the projects identified?

5

Is the project execution methodology identified?

6

Are the acceptance criteria and project closure criteria mentioned?

7

Are the infrastructure and training requirements identified?

8

Is the project monitoring and control covered?

9

Are the testing methods and techniques mentioned?

10

Are the project specific standards identified?

11

Is the metrics management explained?

12

Are the configuration and risk managements defined?

13

Does the plan cover the whole project?

14

Does every phase/object have a start and end date?

15

Is the total time required for each phase estimated?

16

Are the activities for each phase defined, with appropriate time scales?

17

Are the estimates for the staff and times reasonable?

18

Is there any basis for estimates? (e.g.) similar project?

19

Is there an externally imposed deadline? Have the estimated dates simply been calculated from it? If so, how realistic are they?

20

Where one task is shown to be dependent upon another, what will be the consequences of any delay in completing the first task?

21

Are there any activities, which are parallel activities? If so, is the relationship between activities clear?

22

Does the plan show how communications with all the interested parties will be maintained? Consider customer, users, other members of the project, external organizations, those providing expert assistance etc.

23

Are the project's organizational structure, resource allocations, schedules, and milestones complete?

24

Are risks adequately addressed and solutions identified?

25

Have assumptions are documented?

26

Is the primary obective of the Project management Plan (PMP) and each section being met?

27

Do resource allocations, schedules and milestones compare with estimates/results for similar efforts?

28

Is substantiating information to support proposed allocations, schedules, and milestones available?

29

Is the information provided of necessary and sufficient detail for the intended audience?

30

Does the QA Plan covers all the review objects, responsibility, reviewers, type of review, approval authority etc.

31

Does the Project Quality Plan contain the Quality Goals & objectives correctly identified?

32

Has the re-planning criteria defined in the project plan?

33

Has the distribution list defined in the projectplan?

O. Configuration Items

Phase

Milestone

Configuration Items

Item Type

Baseline Event/Criteria

Responsibility

Project Preparation

Project Charter

Project Charter

Document

Approval from SM /sign off from customer

Project Manager

Project Preparation

Planning

Project Plan

Document

Approval from SM & TC

Project Manager

Project Preparation

Planning

Test Plan

Document

Approval from SM & TC

Project Manager

Business Blue Print

Business Blue Print

Business Blue Print

Document

Sign off from customer

Team Member (Functional)

Preparation of Customer ABAP Object List

Customer ABAP Object List

Document

Sign off from customer

Team Member (ABAP)

Identification of Adjustments to SAP Standard Objects

SPDD / SPAU Object List

Sign off from customer

Team Member (ABAP)

Realization

Functional Specification Preparation

Functional Specification

Document

Sign off from TL (ABAP) / PQM

Team Member ( Functional Consultant)

Technical Specification Preparation

Technical Specification

Document

Approval from TL (ABAP) / PQM

Team Member (ABAP)

Coding

Coded Units

Source code

End of Integration Testing

Team Member (ABAP)

Unit / BaselineTesting & Integration Testing

Unit Test Specification& Test results, Integration Test Specification & Result

Document

Approval from TL (ABAP) / PQM / Sign off from Customer

Team Member (ABAP)

Tested Units

Executable/ scripts

Approval from TL (ABAP) / PQM / Sign off from Customer

Team Member (ABAP)

Program Documentation

Document / updation in SAP

Approval from TL (ABAP) / PQM

Team Member (ABAP)

Final Preparation

Customization

Customization Document

Document

Approval from PM / Sign off from Customer

Team Member ( Functional Consultant)

Identification of changes for Synchronization

Synchronization Program Llist

Document

Sign off from Customer

Team Member (ABAP)

Other documents listed under controlled documents also will be maintained with proper naming convention.

* Projects have to define the Criteria/Events for the baseline of their identified Items e.g..

v Configurable Item = Source Code

Possible Baseline Events = After Code Review, Unit Testing, Code Release for IT, End of integration testing etc

v Configurable Item = Integration Test Specification

Possible Baseline Events = When review comments incorporated etc

No comments:

link us...

For Visitors

if you want to publish or Add something on ERP, SAP , SAP FUNCTIONAL, SAP ABAP then mail us along with your email-id. contain must be yours

email-id :- avinashkr_raj@yahoo.com(any email)

email-id :- avinaskr_raj.abap@blogger.com ( use only gmail)