G. Project Quality Records
Project Charter |
Project Plan with all Supporting Documents |
Blue Print |
Functional Specification |
Technical Specification |
Walkthrough / Review reports |
Unit /Baseline Test Spec |
Integration Test Spec |
Unit /Baseline Test results |
Integration Test Results |
Acceptance |
Customer Correspondence |
Change Control Records |
Training Records |
PES Decision Sheets |
Project Reports |
Document Distribution Lists |
Code Review Reports |
Project Metrics |
Marked Checklists |
Customer ABAP Object List |
SPDD / SPAU Program List |
Upgrade Document |
Synchronization List of Program |
Installation Log |
|
Note: Project Quality Records will be retained in the Livelink for minimum 2 years / as decided by SEPG. |
H. Controlled Documents in a Project
1. Project Charter |
2. All plans - project, quality, configuration management, test, training, risk management |
3. All specifications - BP, Functional Specs, Technical Specs, Customization Document |
4. All test specifications (unit / baseline, integration) |
5. All review records , audit reports |
6. Maintenance Requests, Change Requests, Change Control Logs etc. |
7. All upgrade related Documents like Customer ABAP Object List, Upgrade Document, SPDD / SPAU Object List List, Synchronization Program List, Transport Document etc. |
8. Project Report |
|
Note: Version Control will be maintained for charter, plan & specifications. Other documents will be controlled with the proper naming convention identified in the document numbering scheme. |
I. Formats
Page 1, the first page of all templates contains the following information in the format shown below: | ||||||||
Project Name: | | |||||||
Document Name: | | |||||||
Document ID: | | Version No: | | |||||
Prepared by: | | Contact No. | | Date: | | |||
Reviewed by: | | Contact No. | | Date: | | |||
Approved by: | | Contact No. | | Date: | | |||
Released by: | | Contact No. | | Date: | | |||
| | | | | | | | |
| | | | | | | | |
Revision History | ||||||||
| | | | | | | | |
Sr. No. | Version No. | Date of Revision | Section Number | Description of Change | Reason for Change | Change made by | Reviewed by | |
| | | | | | | | |
The following header is printed on all project documents subject to control: | | | ||||||
------------------------------------------------------------------------------------------------------------ | ||||||||
| MARKWAY TECHNOLOGIES PVT. LTD. | | ||||||
| | | | | | | | |
------------------------------------------------------------------------------------------------------------ | ||||||||
The following footer is printed on all project documents subject to control: | | | ||||||
| | | | | | | | |
------------------------------------------------------------------------------------------------------------ | ||||||||
| | | | | | | | |
Document ID | Page I of n | | Controlled Document | | ||||
Document Name | | | | ãCopyright - Do Not Duplicate | ||||
------------------------------------------------------------------------------------------------------------ | ||||||||
| | | | | | | | |
In the footer, I stands for current page number and n for the total number of pages. | | |||||||
| | | | | | | | |
Documents other than templates like any type of Reports, Checklists, Excel Sheets etc. need not | ||||||||
have a separate first page. However, header & footer should remain same for every document except | ||||||||
for Excel sheets. | | | | | | | ||
| | | | | | | | |
Guidelines/examples in template shall be in italics. Body text shall be Arial 10. | | |||||||
| | | | | | | | |
This format shall be followed for all internal documents where as for the documents shared with | ||||||||
customer, the format may be changed as per their requirement. | | | ||||||
| | | | | | | | |
However, in such case a separate standard has to be defined. | | | | |||||
| | | | | | | | |
Whenever a project document is prepared, the heading / name of the document shall be suitably | ||||||||
modified to suit the project. | | | | | |
J. Document Numbering Scheme
This section explains the numbering scheme for all SISL documents within the scope of the Quality Management System. | ||||||||
| | | | | | | | |
1. Numbering scheme for project documents | | | | | ||||
| | | | | | | | |
The document number will have the following format: | ||||||||
| | | | | | | | |
| ||||||||
| | | | | | | | |
Where | ||||||||
| | | | | | | | |
Ø Project ID is assigned by PM and will be having a maximum of “5” character length. | ||||||||
| | | | | | | | |
Ø Document ID is the Short name of the Document and will be having a maximum of “4” character length except for engineering documents. | ||||||||
| | | | | | | | |
For engineering documents, | ||||||||
| | | | | | | | |
Document ID shall be | ||||||||
| ||||||||
| | | | | | | | |
Where, | ||||||||
Module ID shall be limited to “3" character length & Number shall be of “3” character length preferably running serial number. | ||||||||
| | | | | | | | |
If specific module is not applicable, Module ID can be given as “ZZ” | ||||||||
| | | | | | | | |
Ø Free text shall be either Version Number, Date or Month as suitable. | ||||||||
| | | | | | | | |
2. Illustration of Document Numbering Scheme | ||||||||
| | | | | | | | |
Ø First version of Project plan of EMCURE Project shall be | ||||||||
| | | | | | | | |
EMCUR_PP_1.0 | ||||||||
| | | | | | | | |
Ø Project Quality Report for the month of January 2004 for EMCURE project shall be | ||||||||
| | | | | | | | |
EMCUR_PQR_Jan04 | ||||||||
| | | | | | | | |
Ø Minutes of Meeting dated 01-01-04 for EMCURE project shall be | ||||||||
| | | | | | | | |
EMCUR_MOM_01Jan04 | ||||||||
| | | | | | | | |
Ø Functional Specification for SD module for EMCURE project shall be | ||||||||
| | | | | | | | |
EMCUR_FS01_SD001_C014 | ||||||||
| | | | | | | | |
Ø Blue Print for EMCURE project shall be | ||||||||
| | | | | | | | |
EMCUR_BP_ZZ001_1.0 | ||||||||
| | | | | | | | |
3. General Note for Naming and Numbering Convention | ||||||||
| | | | | | | | |
1. No Space should be provided before and after underscore. | ||||||||
2. For Configurable items, versions would start at 1.0 and for changes, the version control will be in steps of 1.0, starting from 1.0, and 2.0, 3.0 and so on for all major changes like changes in scope, schedule deliverables etc. For minor changes, versions shall be maintained 1.1, 1.2 etc. Decision on major & minor shall be to the discretion of Project Manager. This shall be clearly defined in the Project Plan | ||||||||
| | | | | | | | |
3. All draft documents shall contain DX along with version number, where “X” is the draft number. e.g. COA-PP-D1 for the first draft & COA-PP-1.0D1 for the draft, during revision after base lining the first version. | ||||||||
| | | | | | | | |
4. Live link labelling shall be as per the id of the document. | ||||||||
| | | | | | | | |
4. ID FOR STANDARD MODULES ARE | | | | | ||||
| | | | | | | | |
Module Name | ID | | | | | | ||
Financial Accounting | FI | | | | | | ||
Controlling | CO | | | | | | ||
Materials Management | MM | | | | | | ||
Production Planning & Controlling | PP | | | | | | ||
Production Planning & Controlling – Process Industry | PI | | | | | | ||
Quality Management | QM | | | | | | ||
Sales & Distribution | SD | | | | | | ||
Plant Maintenance | PM | | | | | | ||
Customer Services | CS | | | | | | ||
Project Systems | PS | | | | | | ||
Treasury | TR | | | | | | ||
Advance Planning & Optimizing | | | | | | | ||
Business Information Warehousing | BIW | | | | | | ||
Customer Relationship Management | CRM | | | | | | ||
Strategic | SEM | | | | | | ||
| | | | | | | | |
5. SAMPLE SHORT NAME FOR STANDARD DOCUMENTS IN A PROJECT ARE | ||||||||
| | | | | | | | |
Document Name | Short Name | | | | | | ||
Project Plan | PP | | | | | | ||
Project Charter | PC | | | | | | ||
Blue Print | BP | | | | | | ||
Functional Specification | FS01------FS99 | | | | | | ||
Technical Specification | TS01------TS99 | | | | | | ||
Unit Test Specification & Results | UTS | | | | | | ||
Integration Test Specification & Results | ITS | | | | | | ||
Responsibility Transfer Form | RTF | | | | | | ||
Project Report | PR | | | | | | ||
PES Decision Sheet | PDS | | | | | | ||
Minutes of Meeting | MOM | | | | | | ||
| DEW | | | | | | ||
Customer Feedback Form | CFF | | | | | | ||
Project Organization Structure | POS | | | | | | ||
Attendance Record | AR | | | | | | ||
Course Feedback | CF | | | | | | ||
Lessons Learnt | LL | | | | | | ||
Risk Escalation Level Calculator | REL | | | | | | ||
Program Documentation | PD | | | | | | ||
Test Details & Error Log | TE | | | | | | ||
Customization Document | CD | | | | | | ||
Note: Above are the suggested short names if not separately defined in Project Plan. If the project contains deliverables not listed above, the shortname shall be defined in the projectplan |
K. Quality Assurance Table
Responsibility | Reviewers | Type of Review | Approval | |
Estimation Document | TL / PM | PM/SM | Offline Review | PM/SM |
Project Charter | PM | SM, PQM | Offline Review | SM / Customer |
Project Plan | PM | PQM, TC, SM | Walkthrough | SM,TC |
Project Report | PM & PQM | PQM, TC & SM | 4 eyes Review / Offline Review | TC, SM |
Business Blue Print | PT (Functional) | Self review - 100%, Sampling by Peer / PQM | 4 eyes review / Offline Review | PM / Customer |
Functional Specification | PT (Functional) | Self review - 100%, Sampling by TL / PQM | 4 eyes review / Offline Review | TL |
Technical Specification | PT (ABAP) | Self review - 100%, Sampling by TL / PQM | 4 eyes review / Offline Review | TL |
Code | PT (ABAP) | Code Inspector / Peer PT / TL, Sampling by PQM | 4 eyes review / Offline Review | TL |
Unit Test Specifications | PT (ABAP) | Self review - 100%, Sampling by TL / PQM | 4 eyes review / Offline Review | TL |
Unit Test Result | PT (ABAP) | TL / PQM | Offline Review | TL |
User Documentation ( Offshore ABAP) | PT (ABAP) | Self review - 100%, Sampling by TL / PQM | 4 eyes review / Offline Review | TL |
Integration Test Specifications | Customer /TL | Customer | Offline Review | Customer |
Integration Test Result | Customer /TL | PM & Customer | Offline Review | Customer |
Customization Document | PT (Functional) | Self review - 100%, Sampling by Peer / PQM | 4 eyes review / Offline Review | PM / Customer |
Customer ABAP Object list | PT (ABAP) | Self review - 100%, Sampling by TL / PQM / PM | 4 eyes review / Offline Review | Customer |
SPDD / SPAU Object List | PT (Basis) | Self review - 100%, Sampling by TL / PQM / PM | 4 eyes review / Offline Review | Customer |
Upgrade Document (Development, Quality & Production) | PT (Basis) | PQM, TL / PM | Offline Review | Customer |
SPDD /SPAU Adjustments | PT (Basis) | Self review - 100%, Sampling by TL / PQM / PM | 4 eyes review / Offline Review | Customer |
Synchronization List of Programs | PT (Basis) | Self review - 100%, Sampling by TL / PQM / PM | 4 eyes review / Offline Review | Customer |
Lessons Learnt | PM | PQM | Offline Review | SM |
PES Presentations | PM | PQM | Offline Review | SM |
| | | | |
TC - Technical Controller | TL – Team Lead | SM - Systems Manager | PQM – Project Quality Manager | PT - Project Team Member |
| | | | |
The review participants shown here are recommended. Additional participants may be involved as required. Any person trained in leading a review is suitable for the role of Moderator. | ||||
For minor changes, Offline Review can be done. For major changes, review should be done as suggested | ||||
PQM review with respect to work products will be limited to the adherence of QMS and quality of the deliverable. If PQM is technically qualified to perform the technical review, another reviewer is not required. Alternately peer reviewer also can ensure adherence to QMS. |
L.Difference Between Review Methods
Questions | Off-line Review | 4-Eyes Review | Walkthrough | Inspection | |
Review meeting required ? | no | yes | yes | yes | |
Review object distributed to participants prior to meeting ? | not applicable ( no review meeting) | preferred, but not mandatory | yes | yes | |
Author takes discretion about accepting reviewer's comment | yes | no | no | no | |
Separate Moderator's role defined ? | no | no | yes | yes | |
Separate Reader's role defined ? | no | no | no | yes | |
Selection of reviewers done by Author with Project Manager | not required | permitted ( Author alone can decide ) | yes | no | |
Distribution of review material to the review participants is done by | Author | Author | Moderator | Moderator | |
Is the reader same as author ? | not applicable ( no review meeting) | Reader's role not defined | Reader's role not defined | no | |
Preparation Phase required | Not applicable | no | yes | yes | |
Preparation time rate defined/followed ? | Not applicable | no | yes | yes | |
Review meeting may be cancelled, because reviewers are not completely prepared | Not applicable | may be | yes | yes | |
Formal aspect/stylistic issue/spelling/grammatical errors discussed ? | yes | yes | noted separately but not recorded | no | |
Solutions to problems discussed ? | permitted | permitted | no | no | |
Checklist? | recommended | recommended | mandatory | mandatory | |
Separate Recorder Needed? | no | no | recommended | mandatory |
M. Checklist for Moderator
Review Planning ( before calling for invitation) | |
1 | Is the review object complete? |
2 | Is the review object up-to-date? |
3 | Is the checklist for the review object up-to-date? |
4 | Are all necessary standards/guidelines available? |
5 | Are all referenced documents available? |
6 | Has a room reservation been made? |
7 | Has enough time been planned for the review object? |
8 | Do all reviewers know how the review process is carried out? |
9 | For comments technique: Were all reviewers informed about the deadline for submission? |
10 | Is there any obvious errors in the review object , (before calling review meeting )? |
11 | Is the size of the review object NOT too large ? ( Less errors are detected for too much large object ) |
12 | Is the time estimation for preparation is more or less OK and proportional to the size of the review object ? |
13 | Is the label of the review object locked in configuration management archive ? |
14 | Whether all the necessary tools that need to be run has been actually run ? ( e.g. static code checker for code review, Requirement Tracing tool etc. ) |
After calling for review meeting and before review meeting : | |
1 | Whether there are enough attendance confirmations for the review? |
2 | Have all reviewers received and read the documents? |
3 | Are the reviewers facing major problem in understanding the review object |
4 | Are there large no. of major errors detected by most of the reviewers ? ( In this case, the moderator may cancel the review session ) |
5 | For comments technique: Have all comments been submitted and are they clear? |
During Review Meeting : | |
| Is the version of the review object presented in the meeting is the same ? |
| Are the solutions NOT discussed in the review meeting ? ( In case of Walkthorugh and Inspection ) |
| Is everybody getting a scope to speak out ( including the weakest speaker) ? |
| Is there sufficient time left for the recorder to note down the defect after detection of every error ( no discussion during recording)? |
| Has everybody signed on the review protocol before leaving the meeting room ? |
After the Review Meeting : | |
| Are all the defects corrected & verified? |
| Whether all the open issues ( if any ) detected during the review meeting are closed within planned dates or escalated at higher level? |
| Is the corrected version put under configuration management ( with fixed label ) and released? |
| Whether the author has intimated about the release to the affected group/customer ? |
N. Project Plan Review Checklist
Sr. No. | Point to be Verified |
1 | Are the contents comprehensive in that they cover all activities throughout the project? |
2 | Are the referenced documents mentioned? |
3 | Has the contract/SLA/SOW been referred while preparing the plan? |
4 | Are the deliverables of the projects identified? |
5 | Is the project execution methodology identified? |
6 | Are the acceptance criteria and project closure criteria mentioned? |
7 | Are the infrastructure and training requirements identified? |
8 | Is the project monitoring and control covered? |
9 | Are the testing methods and techniques mentioned? |
10 | Are the project specific standards identified? |
11 | Is the metrics management explained? |
12 | Are the configuration and risk managements defined? |
13 | Does the plan cover the whole project? |
14 | Does every phase/object have a start and end date? |
15 | Is the total time required for each phase estimated? |
16 | Are the activities for each phase defined, with appropriate time scales? |
17 | Are the estimates for the staff and times reasonable? |
18 | Is there any basis for estimates? (e.g.) similar project? |
19 | Is there an externally imposed deadline? Have the estimated dates simply been calculated from it? If so, how realistic are they? |
20 | Where one task is shown to be dependent upon another, what will be the consequences of any delay in completing the first task? |
21 | Are there any activities, which are parallel activities? If so, is the relationship between activities clear? |
22 | Does the plan show how communications with all the interested parties will be maintained? Consider customer, users, other members of the project, external organizations, those providing expert assistance etc. |
23 | Are the project's organizational structure, resource allocations, schedules, and milestones complete? |
24 | Are risks adequately addressed and solutions identified? |
25 | Have assumptions are documented? |
26 | Is the primary obective of the Project management Plan (PMP) and each section being met? |
27 | Do resource allocations, schedules and milestones compare with estimates/results for similar efforts? |
28 | Is substantiating information to support proposed allocations, schedules, and milestones available? |
29 | Is the information provided of necessary and sufficient detail for the intended audience? |
30 | Does the QA Plan covers all the review objects, responsibility, reviewers, type of review, approval authority etc. |
31 | Does the Project Quality Plan contain the Quality Goals & objectives correctly identified? |
32 | Has the re-planning criteria defined in the project plan? |
33 | Has the distribution list defined in the projectplan? |
O. Configuration Items
Phase | Milestone | Configuration Items | Item Type | Baseline Event/Criteria | Responsibility | |
Project Preparation | Project Charter | Project Charter | Document | Approval from SM /sign off from customer | Project Manager | |
Project Preparation | Planning | Project Plan | Document | Approval from SM & TC | Project Manager | |
Project Preparation | Planning | Test Plan | Document | Approval from SM & TC | Project Manager | |
Business Blue Print | Business Blue Print | Business Blue Print | Document | Sign off from customer | Team Member (Functional) | |
Preparation of Customer ABAP Object List | Customer ABAP Object List | Document | Sign off from customer | Team Member (ABAP) | | |
Identification of Adjustments to SAP Standard Objects | SPDD / SPAU Object List | | Sign off from customer | Team Member (ABAP) | | |
Realization | Functional Specification Preparation | Functional Specification | Document | Sign off from TL (ABAP) / PQM | Team Member ( Functional Consultant) | |
Technical Specification Preparation | Technical Specification | Document | Approval from TL (ABAP) / PQM | Team Member (ABAP) | | |
Coding | Coded Units | Source code | End of Integration Testing | Team Member (ABAP) | | |
Unit / BaselineTesting & Integration Testing | Unit Test Specification& Test results, Integration Test Specification & Result | Document | Approval from TL (ABAP) / PQM / Sign off from Customer | Team Member (ABAP) | | |
Tested Units | Executable/ scripts | Approval from TL (ABAP) / PQM / Sign off from Customer | Team Member (ABAP) | | ||
Program Documentation | Document / updation in SAP | Approval from TL (ABAP) / PQM | Team Member (ABAP) | | ||
Final Preparation | Customization | Customization Document | Document | Approval from PM / Sign off from Customer | Team Member ( Functional Consultant) | |
Identification of changes for Synchronization | Synchronization Program Llist | Document | Sign off from Customer | Team Member (ABAP) | | |
| | | | | | |
Other documents listed under controlled documents also will be maintained with proper naming convention. | ||||||
* Projects have to define the Criteria/Events for the baseline of their identified Items e.g.. | | |||||
v Configurable Item = Source Code | | | ||||
Possible Baseline Events = After Code Review, Unit Testing, Code Release for IT, End of integration testing etc | ||||||
v Configurable Item = Integration Test Specification | ||||||
Possible Baseline Events = When review comments incorporated etc | | | |